Skip to main content

Sample scenarios

Each scenario is one simulated delivery day in one industry. The Route4Green dispatch plan is compared with a simple routing rule, both measured on the same road map.

  • Dealer distribution: 100 dealers in Ho Chi Minh City

    One central warehouse in Binh Tan, 20 trucks of 2.5 t and 100 dealers in the outer wards to restock in a day. Unloading takes about 20 minutes a stop, so which orders share a trip decides both the distance and the hours on the road.

    100 orders20 trucks

    Synthetic demonstration data, not measured figures.

    Open the scenario
  • Coming

    Store replenishment within receiving hours

    This scenario needs the engine to apply receiving hours, so it opens once that is in place.

For your IT team

The engine also plans several depots, pickups and deliveries on one trip, and order assignment across a whole fleet. These have no sample scenario yet; the technical description is on the Route4Green site.

Read the technical docs